Pretoria Bridge closed due to water main break

This was posted more than 12 months ago. The information may be outdated.

By CTV News Ottawa, July 27, 2018

The Pretoria Bridge is closed this morning due to a water man break.

The crossing is closed between Colonel By and the Queen Elizabeth near Elgin Street and Main Street.

It is unclear how long the road will be closed while workers make repairs.

https://ottawa.ctvnews.ca/pretoria-bridge-closed-due-to-water-main-break-1.4030346