Expropriations required to build Baseline transit corridor

By CFRA News, January 26, 2017

A report for next Wednesday's Transportation committee says 15 private properties will have to be completely expropriated to make way for the Baseline transit corridor.

The 14-kilometer-long corridor will run down the median of Baseline Road from Heron, connecting with the O-Train, to the Transitway at Bayshore.

The report says the right of way would also require the expropriation between one and 15 meters at another 207 private properties, and ten publicly-owned properties.

http://www.iheartradio.ca/580-cfra/news/expropriations-required-to-build-baseline-transit-corridor-1.2359253

Connect with us