By Randy Tumulty, Ottawa Metro News, November 17, 2016
There is still a lot of concrete to pour and track to lay down, but the first Confederation Line train will be on the rails within days.
LRV – 1, as it’s named, the first fully assembled and operational train car for the new line, arrived in Ottawa this week from an assembly facility in Hornell, NY.
It will be running on the line soon, between the Belfast maintenance yard and the main track as part of the early testing.
http://www.metronews.ca/news/ottawa/2016/11/17/first-confederation-line-train-to-hit-the-track-soon-.html