Rideau Street sinkhole floods 300 metres of LRT tunnel - Ottawa - CBC News

This was posted more than 12 months ago. The information may be outdated.

By Amanda Pfeffer, CBC News Ottawa, June 10, 2016

Engineers say 300 metres of light rail tunnel are flooded after Wednesday morning's Rideau Street sinkhole and water main break.

Engineers for the Rideau Transit Group (RTG) went down into the tunnel Friday to assess the damage for the first time since workers were told to drop their tools and leave the site in the minutes after the street above the tunnel fell away, creating a sinkhole five metres deep.

http://www.cbc.ca/news/canada/ottawa/lrt-tunnel-work-stalled-repairs-sinkhole-1.3628083