By Jon Willing, Ottawa Sun, May 26, 2014

The LRT tunnelling machine that started inching east from LeBreton Flats last
November has almost dug half of a kilometre through downtown Ottawa. Jawbreaker
(Grade 4 students named the tunnelling machines) has travelled about 441 m and
has arrived under at the future Lyon station at Queen St. and Lyon St. The
"roadheader" machine is carving out the station cavern. via
Jawbreaker hits Lyon St., 25% of LRT tunnel done | Ottawa & Region | News
| Otta.